BIS 2023
Conference Management System
Main Site
Submission Guide
Register
Login
User List | Statistics
Abstract List | Statistics
Poster List
Paper List
Reviewer List
Presentation Video
Online Q&A Forum
Access Mode
Ifory System
:: Abstract ::

<< back

Evaluation of equipment productivity to achieve target in barging activities
Trie Wardoyo- Mixsindo Korra Herdyanti- Irfan Marwanza

Mining Engineering Department, Faculty of Earth Technology and Energy, Universitas Trisakti, Jalan Kyai Tapa No.1, Tomang, Grogol Petamburan, West Jakarta 11440


Abstract

Barging is an essential activity in the coal supply chain. The barging process takes place in the stockpile area near the port. There are some types of equipment used for the barging process, such as wheel loaders, excavators, and belt conveyors. There was a problem with coal barging activity. The wheel loader and excavator did not achieve the productivity target to feed the belt conveyor. In actuality, productivity targets only 431.17 tons/hr from 500 tons/hr. This research aims to analyze the causes of inadequate productivity of equipment in supporting barging activities, as well as simulating equipment combinations in order to achieve productivity targets. After analyzing the productivity of the two types of equipment, a wheel loader simulation was carried out, and it was determined that adding one unit of wheel loader could achieve the target. The total productivity would be 597.93 tons/hour.

Keywords: barging, coal, equipment, productivity, simulation

Topic: Engineering

Plain Format | Corresponding Author (Trie Wardoyo)

Share Link

Share your abstract link to your social media or profile page

BIS 2023 - Conference Management System

Powered By Konfrenzi Ultimate 1.832M-Build6 © 2007-2025 All Rights Reserved