BIS 2022
Conference Management System
Main Site
Submission Guide
Register
Login
User List | Statistics
Abstract List | Statistics
Poster List
Paper List
Reviewer List
Presentation Video
Online Q&A Forum
Access Mode
Ifory System
:: Question & Answer ::

Video Direct Link | Abstract

Abstract
ABS-244
Inspection Scheduling Decision Model at CNG Charging Station Using Risk Based Inspection (RBI) Method
Eko Muh Widodo1, 3, a), Suroto Munahar2, 4, b) and Naufal Ammar Zada1, c)
Corresponding Author: Eko Muh Widodo


Question & Answer to the Presentation

BIS 2022 - Conference Management System

Powered By Konfrenzi Ultimate 1.832M-Build6 © 2007-2025 All Rights Reserved