Abstract
ABS-244
Identification of Precast Box Girder Erection Activities to Develop Work Breakdown Structure in Elevated Railway Infrastructure Project
Nina Purwanti (a*), Pungky Dharma Saputra (a), Muhammad Hamzah Fansuri (a), Anasya Arsita Laksmi (a)
Corresponding Author: Nina Purwanti


Question from Ms. Yulia Kurniaty
2020.11.18 11:04:15

is this method can be applied in any soil contour?

Reply from Ms. Nina Purwanti
2020.11.18 13:42:42

Thanks for your question, Ms. Yulia. This method basically could be applied in any
soil contour. However, in a situation where the trailer does not have access due to
soil contour in transporting the girder box, the method has back feeding method to
back up the situation.