ICComSET 2020
Conference Management System
Main Site
Submission Guide
Register
Login
User List | Statistics
Abstract List | Statistics
Paper List
Reviewer List
Presentation Video
Online Q&A Forum
Access Mode
Ifory System
:: Abstract ::

<< back

Minimize Downtime of Mension Medical Devices with Age Replacement Method and Group Replacement
Hermita Dyah Puspita(a*), Ragil Pardiyono(b)

a) Universitas Jenderal Achmad Yani, Bandung, Indonesia
**hermitadp[at]gmail.com
b) Universitas Jenderal Achmad Yani, Bandung, Indonesia


Abstract

XYZ Hospital Laboratory is a medical laboratory in which the various checks carried out on biological specimens to obtain information about the state of one^s health. In this study, the proposed schedule of preventive maintenance for critical components on a tool that is often damaged, a tool Mension for Cuvette component Window, R1 and R2 Probe, diaphragm, pump panel and lights. Gam tool for reagent cartridge components and tools for component Citex belt, sealer and optics. The method used to determine the optimal treatment scheduling policy is by Age Group Replacement and Replacement. Saving cost of care obtained by applying the proposed preventive maintenance on the tool Mension for R1 & R2 component of the probe and components cuvette window as big as 89.13% replacement interval of 42 days, amounting to 83.58% diaphragm component replacement intervals for 21 days, the panel Pump components of 91.45% 151 day intervals and component replacement lamp replacement interval of 74.16% 279 days.

Keywords: Preventive Maintenance, Age Replacement- Group Replacement- Efisiency Cost Maintenance

Topic: Engineering and Technology

Plain Format | Corresponding Author (Ragil Pardiyono)

Share Link

Share your abstract link to your social media or profile page

ICComSET 2020 - Conference Management System

Powered By Konfrenzi Ultimate 1.832L-Build9 © 2007-2025 All Rights Reserved